Two-stage Rotary Vane Compressor
40 to 500 Horsepower; 29″ HgV Vacuum to 15 PSIG Inlet Pressure
Maximum Discharge Pressure 150 PSIG
40 to 500 Horsepower; 29″ HgV Vacuum to 15 PSIG Inlet Pressure
Maximum Discharge Pressure 150 PSIG
The TESCORP "CVR-2" Series is a completely self-contained two-stage compression system for applications for stock tank vapor recovery, flare gas recovery, or medium pressure process gas application. Constructed with a rugged rotary vane compressor, TESCORP vapor recovery technology and components; the CVR-2 is a complete and fully automated system for applications that require gas cooling, proportional capacity control, and sophisticated PLC driven control logic and communications..
*Price available upon request
The unit offers the following design and optional features:
Two-stage rotary vane compressor with:
Liquid-cooled for continuous duty
Oil-lubricated compressor
Mechanical seal
Special vapor recovery heads for saturated gas applications
Force feed lubrication system complete with:Progressive flow type divider block lubricator, manifold, filter, and oil storage reservoir
Inverter duty for application with "VFD" drive
Suction and inter-stage scrubbers are constructed per the following:Designed, constructed, stamped and National Board Certified per ASME Section VIII
1/8" corrosion allowance
316 SS mist eliminator
Condensate level controls, gauges, pump rated for flow and pressure
Heat exchanger assembly complete with the following:Gas Inter-Cooler and After-Cooler are designed for 30F approach at 100F ambient complete with motor and manual louvers
Designed, constructed, stamped and National Board Certified per ASME Section VIII
Closed loop compressor jacket water cooling system for continuous 24/7 duty
Force feed lubrication system complete with:
Suction and inter-stage scrubbers are constructed per the following:
Heat exchanger assembly complete with the following:
Piping materials, welding procedures, design and construction are per the following:
ANSI B31.3 latest edition
Vapor Recovery Control Panel is designed per NEC Class I, Division II, Class B, C, & D with:TESCORP vapor recovery logic, controls and instrumentation
Linear flow control logic with proportional bypass valve
DCS communication logic
CVR-2 Unit Construction:All electrical components and wiring per NEC Class I, Division II, Class B, C, & D
Skid assembly shall conform to ASTM A-36 requirements
All rotating equipment is fully protected with non-sparking guards
All units receive a complete mechanical/control run test with documentation
Options:Sour or corrosive gas protections
Motor starters and/or VFD drives
Vapor Recovery Control Panel is designed per NEC Class I, Division II, Class B, C, & D with:
CVR-2 Unit Construction:
Options: